How Much Extra does a Panel Upgrade Add to Ev Charger Installation Costs?

Upgrading your electrical panel specifically for an EV charger installation typically adds between $1,500 and $3,000 to your project total. When combined with the cost of the Level 2 charger itself, most homeowners in the Altadena area can expect a total investment ranging from $2,300 to $4,500.

In cases where your home requires a full service upgrade—which involves running new lines from the utility pole and coordinating directly with the power company—the total cost for the panel and charger installation generally falls between $3,500 and $6,000.

Several factors influence your final investment:

  • Panel Complexity: The number of circuits and the specific panel type required.
  • Installation Requirements: The distance from the meter and whether any trenching is necessary.
  • Permits and Coordination: Costs for local permit fees and necessary utility company service disconnections.

While these represent the initial costs, you may be able to offset your investment. Under the Inflation Reduction Act, you may qualify for a federal tax credit of 30% (up to $1,000) for the total project cost, including labor and the panel upgrade. This can bring the effective cost of a panel upgrade down to as low as $1,800.

As trusted local electricians, we always provide a free estimate and perform a residential electrical load calculation to ensure your new 200-amp service provides the safe headroom needed for your home. We recommend hiring a licensed electrician and obtaining necessary permits for all electrical work.


Related FAQs